Day Three

Day three I had to go back to work so I didn't get very many pictures. Had a few
problems today. We didn't get enough top soil to cover all the rubble and fill in
the backyard but hope to solve that after the block is laid.

Construction Index


Front of house with stacks
of railway sleepers that will
be used to make walls in the patio.
 
What you see is a dry concrete mix
that was leveled, packed down and
. then sand for leveling is applied
on the top.
 
 

Top soil has been spread over the
rubble and filling in what was an
old drainage ditch.

A shot back from river
looking toward the road.